One fully mechanized longwall at one affiliated coal mine of Da tang Coal Industry adopted flexible mine grid for the longwall recovery

Pubdate: 2014-10-10 09:15

At the beginning of the new year, one affiliated coal mine of Datang Coal Industry prepared in advance for the mining succession and synchronized the completion of F0209 LW dismantlement and the F0210 LW installation.

The fully mechanized equipment of F0210 LW is in commission on load.

The coal mine used our high strength flexible mine grid as the longwall screen during recovery. After the study and verification of this new material and new technology, analysis on the technology, economy and safety benefit, the coal mine finally approved this new technology. They held training through the pre-shift meeting to reinforce the skill of minors and improved their operation skill and efficiency, on the other hand, the director joined in the regular shifts to the job site to encourage the ambition of minors and increase their efficiency. During? the installation. The coal mine directors with our service engineer organized a great teamwork. The completion of dismantlement of the last longwall and the synchronized? installation of the F2010 longwall was done in 35 days which guaranteed the normal succession of the mining longwalls.